I m remodeling our basement.
Cutting concrete foundation for door cost.
The cost to excavate land for the window well ranges from 50 to 200 per cubic yard.
I wanted to make a partial cut out of a short stem wall recently and the engineer hemmed and hawed about it a bit.
Both dry and wet cut concrete saws are available.
In doing this it looks like i would need to cut a 34 long x 12 high x 8 thick chunk of concrete out of my current foundation.
One of the things we would like to do is move the door about 8ft from it s current spot so as to achieve a bathroom layout that makes sense.
You can cut through a home s foundation to add a door using a concrete saw.
Cutting through a block wall but not the concrete footer would.
There are many different kinds of concrete cutting but the most common are wall sawing core drilling and slab or flat sawing.
The charges for saw cutting concrete are usually dependent on the depth per linear foot.
Either way they are listed in your local or online yellow pages under the heading of concrete breaking cutting sawing core drilling etc a professional concrete cutter will make the process look exceptionally easy and help make short work of your basement remodeling project.
Wall sawing is the process of cutting openings such as doors or windows in concrete walls usually no more than 12 thick but in some cases up to 24 thick.
Red line is future door.
The outdoor cost 1 to 1 5 inches in depth can be about 0 60 per linear foot while indoor cutting costs can around 1 50 per linear foot.
The cost to dig a full basement verse a crawl space was minimal as was the cost of the additional concrete to pour the walls.
You ll typically have to cut 1 to 1 5 cubic yards per well.
This doorway opened up the old basement to the new addition.
Normally done with welded or bolted structural steel outer frame for the door to reinforce the opening you are making then normal door put inside that outer frame and commonly adding reinforcing and or grout filling of the block voids on the blocks surrounding the door opening.
Cutting a full door out could have a lot of affects depending on what that foundation wall is doing.
A top plate a bottom plate and one stud for each joist should do.
The larger the blade is the deeper it will cut.
Definitely check with an engineer.
This is accomplished by using a saw that attaches to a track.
Concrete saws are hand held gas powered tools that feature between 12 and 18 inch blades depending on the model.
However the outdoor costs with a depth of 16 inches will cost about 5 per linear foot while the indoor price is.
I forget now but maybe it was 800 more to dig and pour a full basement and it cost 450 for cutting a door in a concrete foundation.
Rent the largest handheld concrete cutting saw you can find and a rotohammer with a few 3 8 or 1 2 diameter bits and a wide spade chiseling bit.